全国久久综合网_亚州欧美成人影院_國產精品國產自線在線觀看_成人性生交大片免费视频_igao为爱搞点激情国产欧美_国产高潮流白浆喷水免费_日本按摩高潮α级中文片免费_丝袜足交在线播放_亚洲自偷无码中文永久不卡_日本一区二区不卡在线看

PTFE sealing tape, PTFE pipe, PTFE parts, plastic products
Industry trends
Your Current Location :HomeNewsIndustry trends  ? How do you tie the raw material belt?

How do you tie the raw material belt?

Source: Time:2016-10-12 15:38:58 views:

How do you tie the raw material belt? Many times, when you install water pipes, no matter how you tie the raw material belt, or found the faucet leaking, seepage, how is this going on? How do you tie the raw material belt? You can start with the following 3 points:
How do you tie the raw material belt? Many times, when you install water pipes, no matter how you tie the raw material belt, or found the faucet leaking, seepage, how is this going on?
How do you tie the raw material belt? You can start with the following 3 points:
The first point: the raw material belt needs to spiral along the thread direction, and the sealing performance is greatly reduced

The second point: never screw all threads into the raw material belt. Besides avoiding the entrance of raw material into the pipeline, the sealing performance will also be reduced. It is recommended that the second threads begin at the beginning of the thread to be wound and leave the first thread. Following chart:

The third point: raw materials with time winding need a little hard to ensure raw materials with not being pulled off the case wound this way, raw material wrapped up with compact enough to ensure the sealing of firm. Following chart:

Once the raw material has been wrapped, once it is tightened, it is forbidden to return the silk (screw back), otherwise it will be twisted again.

keys: 

Previous:Already the first article

next:Already the last article

Return

Related News

Advanced Search:
Copyright © 2017 Laizhou Luqing Plastic Products Co., Ltd All Rights Reserved